Lorien Engineering Solutions (LES) has a staff of more than sixty specialists who design and deliver manufacturing capital projects in brewing, drinks, food, industrial and pharmaceutical production environments. Working for many of the world’s top manufacturing organisations within the UK and overseas, they were recently awarded a President’s Award for occupational health and safety in construction by R0SPA (Royal Society for the Prevention of Accidents).
Business Challenge
LES director, Bill Treddenick, says “We had a quite manual and labour intensive time and expense booking system in which the same data was entered multiple times.” This process involved entry into Excel, consolidation to Access and then further analysis in Excel again. As with many manual systems, finding people who had not entered their time and chasing them wasn’t easy and added further burden to the system.
Treddenick continues, “We also had an Access-based document register that was not ‘intelligent’ and our concern was that we had knowledge locked in the Company that couldn’t be easily accessed unless you knew a great deal of information on a large number of projects.” The document registers were not being maintained since only two people had access rights to the register. Over time, this led to quality assurance issues on document version control and some documents escaping registration as more people made demands on the system. Eventually, two registers were maintained separately: one for short form documents and the other for drawings.
“We wanted to eliminate the entry time, and the chasing of people for timesheets,” says Treddenick. “We also needed to unlock the project knowledge, and have all staff maintain the register, rather than one or two in the past.”
Solution
LES implemented Ultrasoft Document Management System (DMS) and UltraSoft Time Management System (TMS), linking them as an integrated system. They also utilised UltraSoft Technology’s consultants to assist with training and deployment.
Lorien’s own IT resources installed the system and super-users were identified to familiarise staff with the software and customise it. The implementation for UltraSoft DMS took 16 weeks from order to going live and a further ten weeks for full UltraSoft TMS integration. These periods included durations of parallel operation with the replaced systems.
Business Benefits
Cost savings
Treddenick estimates that the net savings year on year average around £60,000pa. “This system largely paid for itself in its first year,” Treddenick says.
Solution